HydroelectricHydroelectric power plant·Mesudiye / Ordu
Murat Hydro
Located on the Baldıran Stream in Mesudiye, Ordu, the plant has an installed capacity of 11.91 MWm / 11.09 MWe with three Francis turbines. In commercial operation since 2014 and VCS (Verified Carbon Standard) certified since that year, Murat is projected to generate 16,430 MWh a year on average, avoiding around 9,370 tonnes of CO₂ annually.
Nothing beyond the technical data needed to run the site is loaded without your permission. Turning on optional content such as statistics and maps is your choice. Cookie Policy