Elestaş Elektrik Üretim A.Ş.
Contact TR
Murat HES
Home/ Power Plants/ Murat Hydro
Hydroelectric Hydroelectric power plant · Mesudiye / Ordu

Murat Hydro

Located on the Baldıran Stream in Mesudiye, Ordu, the plant has an installed capacity of 11.91 MWm / 11.09 MWe with three Francis turbines. In commercial operation since 2014 and VCS (Verified Carbon Standard) certified since that year, Murat is projected to generate 16,430 MWh a year on average, avoiding around 9,370 tonnes of CO₂ annually.

Project details

Company
Elestaş Elektrik Üretim A.Ş.
Plant name
Murat Hydro
Energy source
Hydroelectric
Licence no / date
EÜ/3527-3/2169 - 08/12/2011
Installed capacity
11.91 MWm / 11.09 MWe
Annual generation
16,430 MWh (projected annual average)
Location
Mesudiye / Ordu
Commissioning date
01.12.2014
Murat HES