Araklı 1 Hydro
Located on the Haliloğlu Stream in Araklı, Trabzon, the plant has an installed capacity of 15.36 MWm / 14.91 MWe with three Pelton turbines. In commercial operation since 2013, Araklı 1 has held I-REC certification since 2021, with a projected average annual generation of 21,710 MWh.
Project details
- Company
- Elestaş Elektrik Üretim A.Ş.
- Plant name
- Araklı 1 Hydro
- Energy source
- Hydroelectric
- Licence no / date
- EÜ/13121-13/06347 - 26/12/2024
- Installed capacity
- 15.36 MWm / 14.91 MWe
- Annual generation
- 21,710 MWh (projected annual average)
- Location
- Araklı / Trabzon
- Commissioning date
- 11.04.2013