Hydroelectric Hydroelectric power plant · Araklı / Trabzon

Araklı 1 Hydro

Located on the Haliloğlu Stream in Araklı, Trabzon, the plant has an installed capacity of 15.36 MWm / 14.91 MWe with three Pelton turbines. In commercial operation since 2013, Araklı 1 has held I-REC certification since 2021, with a projected average annual generation of 21,710 MWh.

Project details

Company
Elestaş Elektrik Üretim A.Ş.
Plant name
Araklı 1 Hydro
Energy source
Hydroelectric
Licence no / date
EÜ/13121-13/06347 - 26/12/2024
Installed capacity
15.36 MWm / 14.91 MWe
Annual generation
21,710 MWh (projected annual average)
Location
Araklı / Trabzon
Commissioning date
11.04.2013