Çataloluk Hydro
Located on the Tekir Stream in Onikişubat, Kahramanmaraş, the plant has an installed capacity of 9.84 MWm / 9.54 MWe with two Francis turbines. In commercial operation since 2010 and Gold Standard carbon certified since that year, Çataloluk has a projected average annual generation of 26,190 MWh.
Project details
- Company
- Elestaş Elektrik Üretim A.Ş.
- Plant name
- Çataloluk Hydro
- Energy source
- Hydroelectric
- Licence no / date
- EÜ/8151-1/04112 - 25/10/2018 (eski lisans: 11/11/2009)
- Installed capacity
- 9.84 MWm / 9.54 MWe
- Annual generation
- 26,190 MWh (projected annual average)
- Location
- Onikişubat / Kahramanmaraş
- Commissioning date
- 07.04.2010