Elestaş Elektrik Üretim A.Ş.
Contact TR
Çataloluk HES
Home/ Power Plants/ Çataloluk Hydro
Hydroelectric Hydroelectric power plant · Onikişubat / Kahramanmaraş

Çataloluk Hydro

Located on the Tekir Stream in Onikişubat, Kahramanmaraş, the plant has an installed capacity of 9.84 MWm / 9.54 MWe with two Francis turbines. In commercial operation since 2010 and Gold Standard carbon certified since that year, Çataloluk has a licensed annual generation of 31,990 MWh.

Project details

Company
Elestaş Elektrik Üretim A.Ş.
Plant name
Çataloluk Hydro
Energy source
Hydroelectric
Licence no / date
EÜ/8151-1/04112 - 25/10/2018 (eski lisans: 11/11/2009)
Installed capacity
9.84 MWm / 9.54 MWe
Licensed annual generation
31,990 MWh
Location
Onikişubat / Kahramanmaraş
Commissioning date
07.04.2010
Çataloluk HES