Elestaş Elektrik Üretim A.Ş.
Contact TR
Home/ News/ First Unit Online at Orhanlı Wind Farm

First Unit Online at Orhanlı Wind Farm

Plant 21.12.2020
Orhanlı RES'in İlk Ünitesi Devrede

The first turbine at our Orhanlı Wind Farm in Hatay entered production on 21 December 2020, following acceptance by the Ministry of Energy and Natural Resources. The unit has an electrical capacity of 3 MWe.

Our first wind generation

With this unit, wind becomes part of our generation for the first time. Construction started in 2019, and the remaining two ENERCON E-126 EP3 turbines will follow, bringing the plant to its full capacity of 12 MWm / 9 MWe.